An agency needs a list of client websites with assigned owners and a clear process for responding to an error alert. In the morning, the manager checks for urgent changes; once a week, the team reviews accumulated tasks; after a release, the person responsible checks the affected pages.
One “Site Control” package covers up to five connected websites. If you have more clients, plan additional connections under the current terms. A manual audit of another project and its scheduled automated monitoring require different solutions.
Create a short list of projects
For each client, record the main URL, the account manager, the technical specialist, and the monitoring objective. A store and an informational website may have different important user journeys. Even if the websites use the same platform, the same response process may not suit both.
Add the monitoring start date and the current paid plan limit. Note seasonal campaigns, planned releases, and dependent integrations separately. These are team notes, not automatically detected client attributes. They explain why one project needs a detailed review today while checking new events is enough for another.
Example of a completed entry: “example.ru, online store; manager Anna; developer Sergey; priorities: storefront and inquiries; advertising starts 10 October; we collect issues in the project task tracker.” Store access credentials separately from the spreadsheet.
Separate the morning review from scheduled work
The daily review answers the question of whether an urgent change has occurred. Check availability, the audit’s freshness, and new confirmed issues. For a low-risk project, a brief note is enough. If there is an incident, open a separate task rather than trying to squeeze it into the routine review.
Review the task queue and recurring defects once a week. This is a good time to check representative URLs from different templates, clarify the impact, and plan fixes. A monthly review assesses completed work and remaining limitations. Decide what to fix during the weekly review; report completed work during the monthly review.
After your own release, check the result right away. Read more about choosing a mode in the article on audits and monitoring.
Send issues to the right specialist
| Issue | Who to send it to | What to include |
|---|---|---|
| The website is currently unavailable | Administrator or hosting provider | URL, time, browser result |
| The price on a service page is incorrect | Client manager | Page and wording for approval |
| Product pages have identical Titles | Developer and SEO specialist | Example URLs and naming rule |
| A different page appeared for a query | SEO specialist | Query, region, date, URL found |
Here, Title means the page title, usually visible in the browser tab. The manager follows up with the specialist in the usual task tracker. If the same error recurs on product pages, combine the examples and check the shared template.
Specify which part of the website you checked
The daily automated audit of a connected website is limited to one hundred pages. For a large catalog, this does not mean every product is fully crawled. If the client needs a new section investigated or a large release checked, define a separate sample and scope for the manual audit.
With an active paid subscription, included manual local checks have no monthly limit on the number of runs. However, full audits still come in packages of up to twenty-five, one hundred, five hundred, or one thousand pages, and there is a limit on active manual tasks. Paid plans include MCP and REST API for technical audits only. Paid AI tools are billed separately.
In the client proposal, separate the cost of the service, the agency’s work, and additional operations. Before increasing the number of websites, check the current terms. Do not promise a full daily crawl of a store with thousands of products.
Send the client the result of completed work
For example: “We fixed the delivery link in the shared menu. After the release on 4 October, we checked the homepage, category page, and product page: the link opens the current page. The checkout still needs to be tested with your manager; let’s agree on a test before the advertising campaign starts.”
Get the data from the monitoring dashboard, and the actions and deadlines from your own tasks. The client can see what was done, what was checked, and which question requires their involvement. You can include the overall score with its date, but it does not replace checking a link or form’s functionality.
Use the agreed access method: a report does not become public when an audit is completed. When handing the project to a colleague, leave open tasks with their sources and latest replies so they can continue without collecting the history again.